Report

High-Rise Hotel & Casino Modernization

50 Units·Modernization·Southwest US·(Redacted)

RFQ Builder

Equipment findings organized by vendor category for RFQ preparation.

Controllers

5 items

Motion controllers, drives, and dispatch systems

High

Hotel BOH: Modernize elevator nos. BRS1, BRS2, EP1 and EP2 with new MRL gearless machines, new controllers, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.2Service Elevators BRS1, BRS2, EP1, EP2
Standard

Hotel BOH: Modernize elevator no. BRF1 with new gearled machine, new controller, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Freight Elevator BRF1
Standard

Communication circuit: Telephone circuit terminated at junction box of each controller.

p.7All elevators
Standard

Motor Drive Units: Provide New, Regenerative

p.19All elevators
Reference

Provide for elevators as scheduled. When power is lost in a building, the unit will disconnect the elevator system from the building power source. It will then power up its inverter and provide battery generated three (3) phase power to the elevator controller.

p.52Various elevators per schedule

Door Equipment

14 items

Door operators, entrances, frames, sills, and hardware

Standard

Hotel Tower 1: Modernize elevator nos. TP1-TP6 with new controls, new gearless machines, positioning system, door operators and equipment, governor, signals and fixtures, hoistway wiring, cab interiors, and recondition other equipment as specified.

p.2Passenger Elevators TP1-TP6
High

Hotel BOH: Modernize elevator nos. BRS1, BRS2, EP1 and EP2 with new MRL gearless machines, new controllers, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.2Service Elevators BRS1, BRS2, EP1, EP2
Standard

Hotel BOH: Modernize elevator no. BRF1 with new gearled machine, new controller, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Freight Elevator BRF1
Standard

Restaurant Kitchens: Modernize elevator nos. KS2, KS3, KS4, KS5, KS7 with new controls, new pumping units, positioning system, door operators and equipment, signals and fixtures, hoistway wiring, cab components, and recondition other equipment as specified.

p.3Hydraulic Elevators KS2, KS3, KS4, KS5, KS7, CTS1
Standard

Theatre: Modernize elevator no. CTS1 with new pumping unit and tank, new controls, positioning system, door operator and equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Hydraulic Elevators CTS1, FE3, FE4
Standard

Provide Phase 1 recall switch at main floor elevator lobby and fire control life safety room. Key switches at main floor shall be integrated in hall button station hoistway entrance jamb with engraved instructions.

p.51All elevators
Standard

Elevator No. ALL: Provide new heavy-duty master type solid state closed loop door operators mounted on car enclosure utilizing minimum 12-guage support angles to isolate from direct mounting of operator on the car top.

p.54All elevators
Critical

Elevator Nos. below: Provide new extruded sills with non-slip surfaces and grooves suitable for guides. Extend strut to strut and mount with concealed fasteners.

p.54Various elevators per schedule

+6 more items

Cab & Entrance

13 items

Cab interiors, finishes, and entrance assemblies

Standard

Hotel Tower 1: Modernize elevator nos. TP1-TP6 with new controls, new gearless machines, positioning system, door operators and equipment, governor, signals and fixtures, hoistway wiring, cab interiors, and recondition other equipment as specified.

p.2Passenger Elevators TP1-TP6
High

Hotel BOH: Modernize elevator nos. BRS1, BRS2, EP1 and EP2 with new MRL gearless machines, new controllers, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.2Service Elevators BRS1, BRS2, EP1, EP2
Standard

Hotel BOH: Modernize elevator no. BRF1 with new gearled machine, new controller, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Freight Elevator BRF1
Standard

Restaurant Kitchens: Modernize elevator nos. KS2, KS3, KS4, KS5, KS7 with new controls, new pumping units, positioning system, door operators and equipment, signals and fixtures, hoistway wiring, cab components, and recondition other equipment as specified.

p.3Hydraulic Elevators KS2, KS3, KS4, KS5, KS7, CTS1
Standard

Theatre: Modernize elevator no. CTS1 with new pumping unit and tank, new controls, positioning system, door operator and equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Hydraulic Elevators CTS1, FE3, FE4
High

Provide add for one (1) new 15 inch Elite Display in each cab. Provide a USB port in the service cabinet for content load up. Provide for elevators TP1-TP10, CTP1, CP1-CP2, WG1-WG2, EPP1-EPP4, WPP1- WPP4.

p.18Public passenger elevators
Standard

Service Cabinet: Provide New

p.19All elevators
Standard

Corporate Center #1-4: Provide add for one (1) new 12.1 inch Elite Display in each cab. Provide a USB port in the service cabinet for content load up.

p.19Corporate Center elevators 1-4

+5 more items

Signal Fixtures

2 items

Hall stations, indicators, COPs, and signage

Reference

Car Operating Panels: Provide New

p.19All elevators
Reference

Car Position Indicators: Provide New Hall Position Indicators: Provide New

p.19All elevators

Machines & Motors

15 items

Traction machines, motors, ropes, and governors

Standard

Hotel Tower 1: Modernize elevator nos. TP1-TP6 with new controls, new gearless machines, positioning system, door operators and equipment, governor, signals and fixtures, hoistway wiring, cab interiors, and recondition other equipment as specified.

p.2Passenger Elevators TP1-TP6
High

Hotel BOH: Modernize elevator nos. BRS1, BRS2, EP1 and EP2 with new MRL gearless machines, new controllers, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.2Service Elevators BRS1, BRS2, EP1, EP2
Standard

Hotel BOH: Modernize elevator no. BRF1 with new gearled machine, new controller, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Freight Elevator BRF1
Standard

Restaurant Kitchens: Modernize elevator nos. KS2, KS3, KS4, KS5, KS7 with new controls, new pumping units, positioning system, door operators and equipment, signals and fixtures, hoistway wiring, cab components, and recondition other equipment as specified.

p.3Hydraulic Elevators KS2, KS3, KS4, KS5, KS7, CTS1
Standard

Theatre: Modernize elevator no. CTS1 with new pumping unit and tank, new controls, positioning system, door operator and equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Hydraulic Elevators CTS1, FE3, FE4
Standard

For traction machines, employ a Structural Engineer to study the machine room floor and wall support. Any machines beams can be added.

p.6Traction Machines
High

Provide split unit AC for #CTP1 machine room. Assume the remaining machine rooms are properly cooled.

p.7Elevator CTP1
Standard

Hoist Ropes: Provide New, Provide Rope Lubricators

p.19All elevators

+7 more items

Safety Equipment

7 items

Safeties, governors, buffers, and seismic devices

Standard

Hotel Tower 1: Modernize elevator nos. TP1-TP6 with new controls, new gearless machines, positioning system, door operators and equipment, governor, signals and fixtures, hoistway wiring, cab interiors, and recondition other equipment as specified.

p.2Passenger Elevators TP1-TP6
Standard

Governor Ropes: Provide New

p.19All elevators
Standard

Provide a dual ring and string, continuously monitoring type counterweight displacement device for each counterweight with rings mounted on each corner of frame. Provide a seismic switch device measuring both horizontal and vertical accelerations for each group of elevators.

p.51All elevators
Standard

Provide Phase 1 recall switch at main floor elevator lobby and fire control life safety room. Key switches at main floor shall be integrated in hall button station hoistway entrance jamb with engraved instructions.

p.51All elevators
Standard

Elevator No. ALL: Retain existing oil buffers. Replace seals, clean ram and apply machinist blue dye, readjust to car buffer plates, drain and flush out all oil tanks, clean down, refill and test with full load at contract speed.

p.74All elevators
Standard

Elevator No. ALL: Retain existing, realign, correct balance, clean down and tighten frame bolts. Provide retainer plates to meet seismic code requirements.

p.75All elevators
Standard

Provide new ascending car protection that detects an ascending car over-speed condition at a speed not greater than 10% higher than the speed at which the car governor is set to trip.

p.77All elevators

Electrical

8 items

Traveling cables, wiring, and electrical components

Standard

Hotel Tower 1: Modernize elevator nos. TP1-TP6 with new controls, new gearless machines, positioning system, door operators and equipment, governor, signals and fixtures, hoistway wiring, cab interiors, and recondition other equipment as specified.

p.2Passenger Elevators TP1-TP6
High

Hotel BOH: Modernize elevator nos. BRS1, BRS2, EP1 and EP2 with new MRL gearless machines, new controllers, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.2Service Elevators BRS1, BRS2, EP1, EP2
Standard

Hotel BOH: Modernize elevator no. BRF1 with new gearled machine, new controller, positioning system, door operators and equipment, hall door equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Freight Elevator BRF1
Standard

Restaurant Kitchens: Modernize elevator nos. KS2, KS3, KS4, KS5, KS7 with new controls, new pumping units, positioning system, door operators and equipment, signals and fixtures, hoistway wiring, cab components, and recondition other equipment as specified.

p.3Hydraulic Elevators KS2, KS3, KS4, KS5, KS7, CTS1
Standard

Theatre: Modernize elevator no. CTS1 with new pumping unit and tank, new controls, positioning system, door operator and equipment, signals and fixtures, hoistway wiring, cab components and recondition other equipment as specified.

p.3Hydraulic Elevators CTS1, FE3, FE4
Standard

Communication circuit: Telephone circuit terminated at junction box of each controller.

p.7All elevators
Reference

Provide a complete Voice Annunciation Unit (including the Device, the Wiring to the elevator cab, Speaker and Control System Software designed to include a Voice Annunciation Interface).

p.51All elevators
Reference

Provide for elevators as scheduled. When power is lost in a building, the unit will disconnect the elevator system from the building power source. It will then power up its inverter and provide battery generated three (3) phase power to the elevator controller.

p.52Various elevators per schedule

Specialty

2 items

Communication systems, fire service, and access control

Standard

Communication circuit: Telephone circuit terminated at junction box of each controller.

p.7All elevators
Reference

Communications: Provide New

p.19All elevators